Plastic Home Blender, 1.25L, 300W, 2-speed, CE/CB/GS/EMC Mark, Stainless Steel Cutting
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Beijing
- Validity to:
Long-term effective
- Last update:
2017-12-24 04:35
- Browse the number:
110
Company Profile
- Foshan Geuwa Electric Appliance Co. Ltd By certification [File Integrity]
-
Contact:
geuwa(Mr.)
-
Telephone:
(86 757) 86668666 Ext:3959 (86 757) 86663959
-
Area:
Beijing
-
Address:
East Development Zone, Xiaotang Town, Nanhai District, Foshan, Guangdong, China (528222)
- Website: http://geuwa.wrightsbouncycastlehire.com/
Product details
Model Number: B23 plastic home blenders
Brand Name: Grand
Key Specifications/Special Features:
Specifications:Functions: blend, millMaterials: ABS, PE, PP, stainless steel and ASColor: whiteMotor: 7025Plug: BS/VDE
Rated voltage: 110, 220, 240V
Power: 300W
Speed: e18,000rpm
Features:
Packing:
Loading quantity:
How to use blender:
How to use mill:
- Pure copper motor
- 1,250mL blender jar with ingredient adding cap
- 300W motor and safety switch
- 2-speed and pulse rotation revolving switch control
- Dry mill attachment
- Stainless steel cutting blades
- Inner box: 1 set/gift box (32.5 x 19.8 x 32cm)
- Carton dimensions: 81 x 35 x 66cm
- Quantity/master carton: 8 pieces/carton
- Net weight: 17.5kg
- Gross weight: 19.5kg
- 20ft container: 1,080 pieces
- 40ft container: 2,216 pieces
- 40ft HQ container: 2,840 pieces
- Be sure to tighten container base completely
- Place ingredients in container cover
- Place container on motor housing
- Plug-in, select one of two-speed buttons as required
- Use pulse switch for precision blending
- After blending, switch-off (0) unplug
- Step 1: turn mill upside down, and remove cutter base
- Step 2: place ingredients in container
- Step 3: tightly screw cutter base onto container
- Step 4: place mill on motor housing
- Step 5: plug-in, hold mill and switch on (speed 2)
- Step 6: after grinding, switch-off (0) unplug
Shipping Information:
- FOB Port: Shenzhen
- Lead Time: 40 - 45 days
Main Export Markets:
- Asia
- Central/South America
- Eastern Europe
- Mid East/Africa
- North America
- Western Europe
New Products
-
Beryllium Copper Fingerstock 0097095702
price: Negotiable
-
Outdoor Round Trampolines
price: Negotiable
-
3KW Off Grid Solar System
price: Negotiable
-
Towel Storage Trolley
price: Negotiable
-
High-speed Flexible Circuit Board
price: Negotiable
-
15KW Solar System with Battery Storage
price: Negotiable